Property Description
The apartment in the complex is at the final stage of construction. Between the blocks there is a large swimming pool with a water park. The rich infrastructure of the complex will make your stay or stay as comfortable as possible. For the convenience of clients, there will be a shuttle service to the beach and back. Installment plans are available until the end of construction (12.2023), with a 40% prepayment.