Property Description
The project includes one five-storey building. The infrastructure of the complex includes: a swimming pool, recreation areas, a lobby, parking for bicycles, an elevator, a video surveillance system.
After the completion of the complex, each apartment will have: Steel door, Interior doors designed in accordance with the concept, Kitchen set, Kitchen sink-faucet, Granite worktop in the kitchen, Central satellite system, Video intercom, PVC windows and balcony doors (double glazing), Granite flooring, Ceramic wall covering in the bathroom, Furniture in the bathroom, Bathroom sink - faucet, Spot and LED lighting, Wiring for air conditioning, Wardrobe under the stairs in duplexes.
Completion of construction 30.03.2024.